Inzalo Crushing and Aggregates (Pty) Ltd
WU18568
- Aquatic Assessment
 - Civil Designs
 - Contingency plan
 - Final Basic Assessment Report – KZN 30-5-1-3-2-10724 MP (2)
 - Floodline and SWMP Report Final
 - Geohydro Report
 - Geotechnical Report
 - Groundwater Monitoring Plan
 - Hydrological Impact Assessment Report
 - Naaz IWWMP
 - Vegetation, Aquatic and Risk Assessments
 - Alternatives and maps report
 
Application Forms
- DW758 – Company Form
 - DW763 – Destruction of a Drainage Line
 - DW763 – Mining within 100m of a Drainage line
 - DW767 – Dust Suppression
 - DW767 – Stockpile Area
 - DW768 – Destruction of a Drainage line
 - DW768 – Mining within 100m of a Drainage line
 - DW901 – Property Information
 - DW901 – Stockpile Area
 - DW902 – Property Owner
 - DW905 – Dust Suppression
 
Public participation Process
- Ilanga Classifieds 8-10 April 2021
 - Site Notice Photos
 - Registration and Commenting form – Naaz Quarry
 
Lafarge Lichtenburg
WU20466
- Lafarge Cement Plant MLP Water Uses and sampling points
 - Lafarge Cement Plant MLP without water uses
 - Alternative Water Sources Study
 - Dust Management Plan
 - Environmental Audit Report
 - Environmental monitoring schedule
 - Geohydro report
 - Lafarge Cement Plant Hydrological Impact Assessment Report (August 2022)
 - Lafarge Cement Plant Water Balance Final Report (August 2022)
 - Lafarge EMP – 2011
 - Lafarge Industries Monthly WQR_August 2022 (1)
 - Lafarge Lichtenburg WULA Wetland Specialist Study
 - Lafarge Cement Factory_Section 27 Motivation_WU20466_Oct22
 - Lafarge Stormwater & PCD Preliminary Design Report_Rev00_FINAL
 - Wetland Rehabilitation Plan Final Report (Including DFFE Comments)
 - Larfarge SWMP Report (August 2022)
 - Sewage Management Plan
 - Signed Maintenance Master Schedule
 - Lafarge Lichtenburg Updated Floodline Study Report
 - WULA WU20446
 - Appendix 9 – Lafarge Lichtenburg Cement Plant IWWMP
 - Appendix 15.1 – Waste Classification for Proposed PCDs
 - Appendix 15.2 – Lafarge Stormwater & PCD Preliminary Design Report
 - Appendix 15.3 – Design Calculations
 - Appendix 15.4 – Design Drawings for Pollution Control Dams
 - Appendix 15.5 – Construction Quality Assurance Plan for Polluction Control Dams
 - Appendix 15.6 – Interface Stability Checks
 - Appendix 15.7 – Specialist Reports and Results_Incl Geotechical Report
 - Appendix 20 – Civils Checklist for DWS
 - Lafarge Lichtenburg Water Use Licence Application Report_WU20466_Jan23
 
Tswana Quarry
WU23173
- Registration and Commenting form – Tswana Quarry WU23173
 - Registration and Commenting form – Tswana Quarry WU23173 -Translation
 - Tswana Quarry Master Layout Plan
 - Lafarge Industries Monthly WQR_August 2022 (1)
 - Lafarge Stormwater & PCD Preliminary
 - Lafarge Tswana Sec27
 - Tswana Geohydro Report
 - Tswana Quarry Hydrological Impact Assessment Report (August 2022)
 - Tswana Water Balance
 - Wetland Assessment
 - Environmental Audit Report
 - TSWANA QUARRY- WULA SUMMARY REPORT
 - Tswana Floodline Study Report
 - Tswana Quarry SWMP Report (August 2022)
 - Tswana Quarry IWWMP
 - Tswana Quarry _Section 27 Motivation
 - Tswana Quarry WUL
 
Wisteria Boerdery (Pty) Ltd
1) WU19372
- Background information and registration letter
 - Water Use Licence Application report – Wisteria 1
 - Wisteria1_WULA_Geohydrological Report
 
2) WU21091
- Background information and registration letter
 - Water Use Licence Application report – Wisteria 2
 - Wisteria2_WULA_Geohydrological Report_Final
 
3) WU21139
- Background information and registration letter
 - Wisteria3_WULA_Geohydrological Report
 - Water Use Licence Application report – Wisteria 3
 
4) WU32471
